Moly Mines Spinifex Ridge
Hero Engineering completes technical specifications, tender documents and system evalutions for the large scale FF based DCS for Moly Mines Spinifex Ridge.
This author has yet to write their bio.Meanwhile lets just say that we are proud ossadmin contributed a whooping 37 entries.
Hero Engineering completes technical specifications, tender documents and system evalutions for the large scale FF based DCS for Moly Mines Spinifex Ridge.
Hero Engineering initiates control systems risk assessments for the Rio Tinto Remote Operations Initiative. Scope included control system migration for rail, port, mine, power and utilities and process plants.
Hero Engineering completes Lihir Gold Mill Expansion project involving electrical design of LV MCCs and 11kV substation augmentation, PLC coding and integration and commissioning.
Hero Engineering completes Lihir Gold Surface Infrastructure project comprising design, installation supervision and commissioning of 11kV substations and LV services for workshops, warehouses and labs.
Hero Engineering completes AnaeCo DiCom Stage 1 electrical, instrumentation and controls. Scope included hazard and operability studies, hazardous area design, SIL Assessment and training.
Apache Energy engages Hero Engineering to undertake electrical and instrumentation validations for the Varanus Island Gas plant.
Hero Engineering completes Blacktip Onshore gas plant Fire and Gas design. The design considers detector Coverage, Maintainability, Availability and compliance to the plant Fire Explosion Analysis.
Hero Engineering achieves ISO9001 certification with SAI Global without exemptions. View our ISO9001 Certificate
Hero Engineering to provide Puffin FPSO with ongoing electrical, instrument and control engineering support.
Hero Engineering completes validation procedures for Alcan Gove’s large scale FF based DCS.